Photo story

Integration of first pieces underway in the new Ariane 6 building in Les Mureaux

Have a look at these first photos of the integration of the first tanks for the Ariane 6 upper stage and the Vulcain aft bay (VuAB) which will house the first Vulcain®2.1 engine from this July.

These are the first parts of the launcher...

Integration of first pieces underway in the new Ariane 6 building in Les Mureaux
© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

© ArianeGroup/MIP/Thomas-LEAUD

See also

Behind the scenes with Ariane 6 in French Guiana: Watch the new video
Innovation Culture

Behind the scenes with Ariane 6 in French Guiana: Watch the new video

When it arrives from Europe, pieces of the launcher are transported to in the Ariane 6 launch zone (ELA4), the launcher’s two…

06-06-2019 |  2 minutes
Ariane 6
Commercial launch services

Ariane 6

Do not miss an article by subscribing to our alerts.

Close 01 12
03 12